Project Highlights
Location: Baltimore, Maryland
Architect: Design Collective, Inc.
Delivery Method: Construction Management at Risk
Owner: Maryland Stadium Authority
Contract Amount: $36.3 M
Project Summary
The Arlington Elementary School project consisted of an 83,010 SF renovation to the existing 1925 and 1936 buildings as well an 18,055 SF addition for an early childhood education center. The building facades were repaired to maintain their historic character and integrity. Additional square footage was added to the lower level cafeteria and classrooms, and the terrace was expanded for dining and outdoor classroom space. The school is on the cutting edge of technology and environmental sustainability.